- Case Study 01020 Nov 2019Commercial
Reedswood Park Regeneration - Walsall
jhai has been appointed as the Building Control surveyors for the Reedswood Park regeneration project in Walsall. The construction of the new offices and warehouses are designed to help regenerate the area by attracting new businesses and through the subsequent creation of hundreds of jobs.
Construction of the project has gone smoothly; all the necessary site visits have been conducted with very little need for comment or indeed alterations. As it stands, the project is almost ready to begin attracting the leading organisations which will help improve the area by providing both jobs and valuable investment into the area.
Read More
- Case Study 01314 Aug 2018Public Sector
Bedford Hospital NHS Trust - Shefford
The development of this specialist medical facility did not stay stay static as part way through actual development, it was decided that Bedford Hospital and the Primary Care Trust would retain ownership of the lease upon completion. This decision had a significant impact upon the development as a partial internal layout redesign was now required to meet the needs of the PCT. In addition the new centre would now need to comply with hospital standards and regulations, and as such a number of
alterations were made.Read More
- Case Study 00901 Nov 2017Commercial
Burgh Island
Burgh island Hotel was originally built in the 1930s on a private tidal island off the south coast of Devon. Rather than extend the existing, landmark Art Deco hotel, an entirely new suite is proposed to be constructed on the remote, easterly headland of the island.The standalone building is envisaged as an inhabited bridge, consolidating the sculptural profile of the eroded mud-stone sea-cliffs. A series of interconnected rooms are organised to frame unique views of the dramatic sea and island landscape.Planning approval was granted in March 2017 and construction is expected to start
on site in 2018.Read More
- Case Study 00819 Feb 2016Domestic
Granny's, Bembridge, Isle of Wight
jhai was appointed to oversee the plan checking and construction of a replacement detached dwelling. We were also appointed to produce the SAP and EPC calculations.
Works commenced on site in September 2011. Over the next nine months jhai oversaw various stages of construction, to ensure that site works were meeting the minimum requirements of the Building Regulations and good construction practices were achieved. The Final Certificate was issued in November 2012.
Read More